Bsports

Back home  |    |  中文

San Jose Hydropower Station in Bolivia

Source:  Release time:2021-01-23

San Jose Hydropower Station in Bolivia

San Jose 1: rated head, 294m; installed capacity, 2×27.5MW

San Jose 2: rated head, 342m; installed capacity, 2×34.5MW

Copyright@2016 Hangzhou Resource Power Equipment Co., Ltd. all rights reserved
No.2688 Weiwu Rd. Linjiang High-Tech Park, Hangzhou Qiantang New Area.China

必一·体育(B-sports)官方网站必一·体育(B-sports)官方网站必一·体育(B-sports)官方网站必一·体育(B-sports)官方网站必一·体育(B-sports)官方网站